Product Description:
1. To facilitate customer purchases, we specialize in providing one-stop customized fabrication services for die-casting,
sheet metal, CNC and lathes.
2. Factory direct selling saves intermediate links, and the price of products is lower, but at the same time, it can ensure
the quality.
Product Description | |
Please provide | 2D, 3D, samples, or the size of the multi-angle pictures. |
Mould material | 45#, 50#, P20, 738, 738H, 718, 718H, NAK80, 2316, 2316A, S136 etc. |
Product material | ABS,PA6,PA66,PP,PC,TPU,POM,PBT,PVC,TPE,TPV,TPO,TPR,EVA,LDPE etc. |
Cavity | Single-cavity, Multi-cavity, or by request. |
Runner system | Cold runner or Hot runner. |
Mould precision | ±0.01mm. |
Software | CAD, PRO-E, UG, Rhinoceros etc. |
Design Time | 1-3 days (normal circumstances). |
Main technology | Milling, grinding, CNC, EDM, wire cutting, carving, lathes, etc. |
Quality System | 100% Inspection before shipment |
QC System | 100% inspection before shipment |
Colour | Customizable |
Shape | capable of all shapes as per drawing |
Service
1. Custom CNC Machining Service:
Customize machining kinds of metal parts and plastic parts according to your drawing or picture.
2. Custom CNC Turning parts:
Customize CNC machining various metal parts and plastic parts according to your drawing.
3. Mold Making:
Plastic injection mold and die casting mold, Injection molding, Surface Finish, Assembling and Test.
4. Custom Design:
We can do the design for you according to your idea and sample.
5. Rapid Prototype Making:
Welcome to make the prototype
FAQ
Q1: Are you a factory or a trading company?
A1: We are a OEM factory located in DONGGUAN, China.which have more than 26 years experience on making cnc machining parts and plastic injection molds.
2. Do You Offer OEM/ODM Service?
Yes, we have rich experience in offering OEM/ODM service. Design service offered.
3. Can machines be used at outside?
With waterproof function, could be used at outsise.
4. What is your MOQ?
Any quantity is acceptable.
5: How about the lead time?
Generally, we need 5~10 days for samples, but it can be shortened for urgent order. 3-4 weeks for mass production.