Sun On (Hui Zhou Subsidiary)
Our services:
Product development, design, production, assembly
Our purpose:
Quality first, customer supreme, continuous improvement, excellence
Quality Policy
Integrity, price, quality, service
Service Items | Plastic parts, die casting, silicone parts, hardware and mold production and processing, CNC processing, hand plate production, 3D printing, CNC precision parts, kits, sheet metal processing, silicone composite die, small batch customization, etc |
Service Features | Complex and difficult sample processing, fast quotation, fast processing, high precision, high-quality product confidentiality, one-to-one service, cost-effective |
Application Area | Mechanical hardware, electronic instruments, household appliances, lighting, 3C digital, mobile phones, auto parts, medical equipment, electronic communication industry, etc. |
Processing Technology | 3/4/5-axis CNC Machining, Lathe Processing, Rapid Prototyping, 3D Printing SLA/SLS/SLM/FDM, Silicone Compound Mold, Sheet Metal Forming, EDM, Wire Cutting, etc. |
Processing Equipment |
CNC Machining Center, CNC lathe, CNC Engraving & Milling Machine, Milling Machine, 3D Printer, Drilling & Tapping Machine, Metal sheets stamping Equipment, Sandblasting Machine, etc. |
Production Capacity | SUD$18000000-22000000 year |
Manufacturing Process |
1.Project Customization 2.Disassembly & Programming 3.Material Preparation 4.CNC Processing,Metal Sheets Processing 5.QC Inspection 6.Surface Treatment 7.General Quality Inspection 8.Shipment of Finished Products |
Drawing Format |
3D: IGS, STP, STEP, PRT, XT, STL (3D Printing File) 2D: DWG, DXF, PDF |
Processing Material |
Metal: Aluminum Alloy, Zinc Alloy, Magnesium Alloy, Titanium Alloy, Steel, Copper, Brass, Stainless Steel, Sheet Metal, etc. Plastic: ABS, PC, PE, PP, POM, Acrylic (PMMA), FR4, Nylon, Bakelite, Silicone Rubber, etc. |
Surface Treatment | Grinding, Polishing, Silk Screen, Electroplating, UV, Oxidation, Wire Drawing, Laser Carving, Sandblasting, Leather Texture, Surface Etching, Baking Finish Encapsulation, Transfer, Bronzing, etc. |
Quality Inspection |
1.Material Quality Inspection 2.Accuracy Quality Inspection 3.Appearance Quality Inspection 4.Functional Quality Inspection 5.Structural Quality Inspection 6.Surface Treatment Quality Inspection 7.Packaging Quality Inspection |
Inspection Equipment | 3-coordinate Measuring Instrument, 2.5-dimensional Measuring Instrument, Inner Diameter Micrometer, Outer Diameter Micrometer, Electronic Height Ruler, Thread Pass-through Gauge, External Thread Ring Gauge, Electronic Caliper, Needle Gauge, etc. |
Production Process |
1.Material Procurement 2.Material Inspection 3.Material Storage 4.Order Picking 5.CNC Processing 6.QC Initial Inspection 7.Surface Treatment 8.QC General Quality Inspection 9.Finished Product Storage 10.Packaging 11.Packaging Inspection 12.Shipment |
Construction Period | 1-10 Days (The Actual Construction Period Depends on the Quantity and Requirements of the Product) |
Product Packaging |
Inner Packing: Foam, Plastic, Paper, etc. Outer Packing: Hard Thick Cardboard Box, Custom Wooden Box, etc. |
Cooperation Process |
1.Provide Samples/Drawings 2.Project Quotation 3.Confirm Order 4. Processing & Production 5.Packaging & Delivery 6.Confirm Receipt |
Payment Method | T/T |
Shipping | Support Express · Sea Freight · Air Freight |