Aluminum zinc alloy sandblasting + powder blasting +CNC+ grinding die casting ball head coating parts
Material | aluminium alloyCold rolled sheet + galvanized etc. |
Tolerance | +/- 0.01mm |
Dimensions | Customized |
Thickness | +/- 0.002-0.02mm / can be customized |
Design and advise | design and skilled support |
MOQ | 100 pcs |
Sample cost | Negotiable, based on the drawing |
Sample time | According to the drawing |
Delivery time | 1-25 days after order with prepayment based on products structure and quantity. |
Payment terms | 50% deposit |
Shipping | By air or sea. expressage |
Service Type | OEM/ODM |
service
1. Research and Development: We support customer research and development. Make documentation or improve the design if needed.
2. Quotation making: Mold quotation will be completed within 1 day according to the information we obtain.
3. Negotiation: quality, price, materials, delivery time, payment method, etc.
4. Mold design: 3-5 days for 3D/2D drawing design of molds and products.
5. Mold: Make mold first and then mold according to customer requirements. We will first send the mold design to the customer for approval.
6. Mold test: When the mold is completed, we test the mold to check whether it meets the needs of consumers. We will send the sample for consumer's reference.
7.Sampleshoot: If the customer is not satisfied with the first sample. We modify the mold until it meets the customer's satisfaction.
8. Delivery: by sea, air or express according to customer's request.
FAQ:
Q1: Are you trading company or manufacturer ?
A: We are factory. We are experienced manufcturer, have our own factory and warehouse.
Q2: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-30 days for the OEM Parts, it is according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What do we need if you want a quote?
A: Please kindly send us your 2D & 3D drawing of your product. The need the detail specifications as follows